What change would be better, and what does it cost?

6
candidates
RecommendedBench cell, for the first 100 builder units

Decision 25: the layout follows volume. The first 100 builder units run on a one-technician bench cell; the U cell bridges to about 4,500 a month and the balanced MadeCell line takes about 10,000. On any fixed eight-station line, split S8 first: it sits at 56 s against a 60 s takt and the Plus One+ checks would push it to 62 s

Tradeoffs: a bench cell is cheap to set up but tops out at about 2,400 a month on one shift

Filled marks are on the Pareto frontier; the ring is the recommendation. Vertical bars are the yield interval.
Objectives
  • Minimise throughput.cycle_time
  • Minimise cost.cost_per_good_unit
Constraints
  • takt 60 s (design target)
  • headcount at most 9
  • no new station type beyond the brief

The layout variants come from the N+1 factory engine (nplus1labs/factory 9bc6753), a discrete-event simulation that runs this OPD's routing with a ±30% spread on every target time. They are simulated from assumed values; uncalibrated; no unit built. The audio loopback, the RF check and wireless charging are outside the simulation. The other scores are expert estimates.

VariantRTYCost per good unitCycle timeHeadsPareto
BBaseline
Full scorecard (4)
throughputcycle time56 s
estexpert-estimateEstimated with expert-estimate. Low confidence.slowest station from target cycle times; nothing built
throughputtakt60 s
estexpert-estimateEstimated with expert-estimate. Medium confidence.design target, about 480 units an 8-hour shift
throughputbottleneck stationsta:s8
throughputheadcount8
——56 s
estexpert-estimateEstimated with expert-estimate. Low confidence.slowest station from target cycle times; nothing built
8—
2U cell, for about 2,000 to 4,500 a month
var:u-cell staffing
Decision 25's bridge between the bench builds and volume. The eight stations as benches in a U with a 2 s hand pass. Two operators: one runs S1 to S6, the other runs S7 and S8. Layout: line/layouts/u-cell.json.
Generated by agent · discrete-event · 2026-11-02
Full scorecard (3)
throughputtakt255.2 s
estanalyticEstimated with analytic. Medium confidence.set by the assumed volume: one 8-hour shift less breaks, 21 working days a month
throughputuph31.6 good units/h
simdiscrete-eventSimulated with discrete-event, 2,000 runs. Low confidence.Evidence: src:factory-engine, src:layout-studycapacity, simulated from assumed values; uncalibrated; no unit built; the operator on S1 to S6 is the constraint
throughputheadcount2
———2—
3Balanced MadeCell line, for about 10,000 a month
var:madecell-balanced mixed
Decision 24's MadeCell base (a 40 x 8 ft frame, four bays, stations facing out from a central conveyor, operators on the floor outside), balanced for decision 25's volume case. 16 pallets and an overhead restocking rail. S1 and S2 share a workstation, as do S3 and S4; S5 and S6 and S7 each run twice; S8 becomes a cell of three test fixtures. Seven people. Layout: line/layouts/madecell-balanced.json.
Generated by agent · discrete-event · 2026-11-02
Full scorecard (4)
throughputtakt51.03 s
estanalyticEstimated with analytic. Medium confidence.set by the assumed volume: one 8-hour shift less breaks, 21 working days a month
throughputuph88.8 good units/h
simdiscrete-eventSimulated with discrete-event, 2,000 runs. Low confidence.Evidence: src:factory-engine, src:layout-studycapacity, simulated from assumed values; uncalibrated; no unit built; W1 (S1 and S2) is the bottleneck, about 79% busy
throughputheadcount7
throughputbottleneck stationsta:s1
———7—
4Split S8: test in one station, mark and pack in another
var:split-s8 station-layout
A ninth bench takes the laser mark and pack off S8. S7 and S8 then both sit at 40 s.
  • add sta:s8: mark and pack move to a new bench after S8
Generated by agent · expert-estimate · 2026-11-01
Full scorecard (3)
throughputcycle time40 s
estexpert-estimateEstimated with expert-estimate. Low confidence.
throughputbottleneck stationsta:s7
throughputheadcount9
——40 s
estexpert-estimateEstimated with expert-estimate. Low confidence.
9—
5Plus One+ (coming next)
var:plus-one-plus design-change
Coming next. The same board with more parts fitted: light sensor, NFC tag, debug jumper; a clear shell option. No new station: a board-variant BOM at S2 and extra checks at S8, which push S8 past takt unless it is split.
Generated by manual · expert-estimate · 2026-11-01
Full scorecard (3)
throughputcycle time62 s
estexpert-estimateEstimated with expert-estimate. Low confidence.S8 gains about 6 s of checks
throughputbottleneck stationsta:s8
throughputheadcount8
——62 s
estexpert-estimateEstimated with expert-estimate. Low confidence.S8 gains about 6 s of checks
8—
6Plus One++ (coming next)
var:plus-one-plus-plus routing
Coming next. Plus One+ boxed with a set of backs. Adds S9 after S8, kitting the backs into the box.
  • add sta:s8: a new S9 after S8 kits the backs into a bigger box
Generated by manual · expert-estimate · 2026-11-01
Full scorecard (3)
throughputcycle time62 s
estexpert-estimateEstimated with expert-estimate. Low confidence.S9 kitting runs in parallel; S8 stays the bottleneck
throughputbottleneck stationsta:s8
throughputheadcount9
——62 s
estexpert-estimateEstimated with expert-estimate. Low confidence.S9 kitting runs in parallel; S8 stays the bottleneck
9—

Design intent

CharacteristicTargetLowerUpperWherePriority · owner
size
Approved exterior direction (2026-11-01): the diameter of a common magnetic phone charger, so the puck sits flush on one. Replaces the 57 mm concept. The CAD, the magnet ring, the lugs and plus-one-base@1 in this file are still sized for 57 mm and need rework
55.4 mm
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
—55.4 mm
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
Top shellmust industrial-design
thickness
Approved exterior direction (2026-11-01): 12.0 mm at most, including the button dome and the base. Replaces 9.5 mm. A 12 mm puck still needs a thinner cell than the stock one; the CAD in this file is still 9.5 mm
12 mm
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
—12 mm
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
Top shell, Base: the interfacemust industrial-design
weight
Light enough to hang on a phone or a bag
28 g
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
—32 g
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
Base: the interfaceshould product
button-travel
Short, firm click you can find without looking
0.3 mm
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
0.2 mm
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
0.4 mm
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
Plus buttonmust product
other
Magnetic hold on a phone mount. It stays put when a phone in a car mount hits a bump
8 N
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
6 N
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
—Magnet ringmust product
other
Lug pull-out. The twist-lock lugs carry the load for clips, lanyards and bikes; the magnets only align
30 N
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
30 N
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
—Base: the interfacemust mechanical
other
Pogo pad current limit. A shorted module trips safely
300 mA
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
—300 mA
InferredEngineering judgement, not measured. Low confidence.Evidence: src:design-briefdesign target
Pogo padmust electrical