How does it go together, and in what order?
- 22
- operations
- 5
- sub-assemblies
- 209 s
- total work content computed
All 22 operations, with method, fixture and cycle time
| Operation | Station | Inputs → output | Cycle time | Method | Fixture |
|---|---|---|---|---|---|
Seat the light-ring diffuser in the top shellop:diffuser-place place | Top shell sub-assembly | part:top-shell, part:ring-diffuser → asm:top-sub | 5 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | by hand onto six stake postsInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | ring nestInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Heat-stake the diffuserop:diffuser-stake heat-stake | Top shell sub-assembly | asm:top-sub → asm:top-sub | 9 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | six-post hot-air cold-stake, timedInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | heat stakerInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Fit the plus buttonop:button-place place | Top shell sub-assembly | asm:top-sub, part:plus-button → asm:top-sub | 4 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | by hand, flange under the skinInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | ring nestInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Place the two mic gaskets over the portsop:gasket-place place | Top shell sub-assembly | asm:top-sub, part:mic-gasket → asm:top-sub | 6 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | jig-located, liner peeledInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | gasket jigInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Place the main board in the top shellop:board-place place | Place main board | asm:top-sub, part:main-pcba → asm:core | 10 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | by hand onto three bosses, LEDs to the ringInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | top-shell nestInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Drive three board screwsop:board-screw screw | Drive board screws | asm:core, part:board-screw → asm:core | 15 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | thread-forming, torque to angle windowInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | top-shell nestInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Dispense adhesive for the speaker and hapticop:adhesive-dispense adhesive | Speaker and haptic | asm:core → asm:core | 8 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | two beads, camera-checkedInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | dispense nestInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Place the speakerop:speaker-place place | Speaker and haptic | asm:core, part:speaker → asm:core | 5 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | jig-located, 5 s holdInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | placement jigInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Place the haptic motorop:haptic-place place | Speaker and haptic | asm:core, part:haptic-motor → asm:core | 5 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | jig-locatedInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | placement jigInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Mate the battery connectorop:battery-mate connector-mate | Battery | asm:core, part:battery → asm:core | 8 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | seat, then a 3 N tug checkInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | connector seating toolInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Place the battery on foam tapeop:battery-place place | Battery | asm:core, part:battery-foam → asm:core | 6 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | locator, lead routed in its channelInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | battery locatorInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Bond the magnet ring into the baseop:ring-bond adhesive | Close the base | part:base, part:magnet-ring → asm:base | 8 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | keyed fixture, polarity checked before the pressInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | ring bonding fixtureInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Place the charging coil and ferrite inside the ringop:coil-place place | Close the base | asm:base, part:qi-coil → asm:base | 6 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | keyed to the base, adhesive-backedInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | ring bonding fixtureInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Press the five pogo pads into the baseop:pad-press place | Close the base | asm:base, part:pogo-pad → asm:base | 6 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | press to a hard stopInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | pad pressInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Close the base onto the coreop:base-close snap-fit | Close the base | asm:core, asm:base → asm:plus-one | 8 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | three snaps, force-monitored pressInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | closing pressInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Check ring polarity, pad height and the keyop:polarity-check inspect | Close the base | asm:plus-one → asm:plus-one | 4 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | polarity gauge and height gaugeInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | pad pressInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Flash firmware and provision the unit IDop:flash-provision flash | Flash, provision, calibrate | asm:plus-one → asm:plus-one | 24 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | over USB-C; unit ID written to eFuseInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | USB-C pogo fixtureInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Calibrate the two micsop:mic-cal test | Flash, provision, calibrate | asm:plus-one → asm:plus-one | 10 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | reference tone in an acoustic boxInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | acoustic boxInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Calibrate the motion sensorop:imu-cal test | Flash, provision, calibrate | asm:plus-one → asm:plus-one | 6 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | six-face tiltInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | tilt tableInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Functional test: button, touch, ring, haptic, IMU, wired and wireless charge, audio loopback, RF checkop:functional-test test | Functional test, mark, pack | asm:plus-one → asm:plus-one | 40 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | scripted test over USB; RF in a shield box; a reference wireless chargerInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | functional testerInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Laser-mark the unit QR on the base rimop:laser-mark label | Functional test, mark, pack | asm:plus-one → asm:plus-one | 6 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | fibre laser, then a read-backInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | laser markerInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |
Pack with the cable and card; no back shipsop:pack pack | Functional test, mark, pack | asm:plus-one, part:retail-box, part:pulp-tray, part:usb-cable, part:quick-card → asm:packed | 10 sInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-brief, src:tracker-puck-spectarget from time-study estimates of similar operations | by handInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed | pack benchInferredEngineering judgement, not measured. Low confidence.Evidence:src:design-briefproposed |