benikigai/ec-1Public

EC-1 Wireless Controller

Synthetic example. Every value is made up to show the format.

Factory · Line

Line

Which stations, how fast, and where's the bottleneck?

11
stations
30 s
cycle time, set by T1 estimated
36 s
takt estimated
11
operators
Summed from each operation's cycle time. Dashed line: 36 s takt. Red: the bottleneck.
Line layoutDrag to turn · scroll or pinch to zoom · click a part
Nothing selected. Hover or click a part to see its id.

line/layout.glb (222 KB)

  1. Incoming inspection iqc
    sta:iqc-1
    Equipment
    caliper and pin gauges
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    light booth
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    battery OCV meter
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    none
    Layout
    /Line/IQC1 · ISA-95 EC1-Cell/IQC1
  2. Top-shell sub-assembly assembly
    sta:a1
    Equipment
    nest fixture for the top shell
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    dome sheet locator
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    none
    Layout
    /Line/A1 · ISA-95 EC1-Cell/A1
  3. Stick and PCBA to bottom shell assembly
    sta:a2
    Equipment
    temperature-controlled soldering iron, 350 C
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    fume extractor
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    PCBA nest
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    none
    Layout
    /Line/A2 · ISA-95 EC1-Cell/A2
  4. Battery and haptic assembly
    sta:a3
    Equipment
    PSA liner peeler
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    battery press, 20 N
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    none
    Layout
    /Line/A3 · ISA-95 EC1-Cell/A3
  5. Close and screw assembly
    sta:a4
    Equipment
    closing fixture
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    electric torque driver, 0.18 N·m, with count check
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    none
    Layout
    /Line/A4 · ISA-95 EC1-Cell/A4
    Device electric torque driver with count check
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log
    mhs-preview
    Measures: final torque (N·m), angle (deg)
    Adjusts: target torque 0.1 to 0.3 N·m
    Safety limits: max torque ≤ 0.3 N·m
  6. Flash test image and RF test test
    sta:t1
    Equipment
    RF shield box
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    BLE tester
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    USB-C pogo fixture
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    ipc-cfx
    Layout
    /Line/T1 · ISA-95 EC1-Cell/T1
    Device BLE tester in RF shield box
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    mhs-preview
    Measures: TX power (dBm), RSSI (dBm)
    Adjusts: channel 0 to 39
  7. Functional test and stick calibration test
    sta:t2
    Equipment
    stick actuation robot
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    button press head
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    IMU turntable
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    ipc-cfx
    Layout
    /Line/T2 · ISA-95 EC1-Cell/T2
    Device stick actuation robot
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    mhs-preview
    Measures: stick position (% of full scale)
    Adjusts: deflection angle 0 to 28 deg
    Safety limits: max push force ≤ 8 N
  8. Cosmetic and gap check fqc
    sta:t3
    Equipment
    camera arch, 4 cameras
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    feeler gauges 0.10 / 0.30 mm
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    ipc-cfx
    Layout
    /Line/T3 · ISA-95 EC1-Cell/T3
  9. Charge and battery test test
    sta:t4
    Equipment
    programmable USB-C load
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    8-up charge rack
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    ipc-cfx
    Layout
    /Line/T4 · ISA-95 EC1-Cell/T4
  10. Label and pack pack
    sta:p1
    Equipment
    label printer and applicator
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    pack bench, scale
    ObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence: src:teardown-log, src:photos
    Operators
    2
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    none
    Layout
    /Line/P1 · ISA-95 EC1-Cell/P1
  11. Outgoing audit oqc
    sta:oqc-1
    Equipment
    full functional test set
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    drop tester (sampled)
    InferredEngineering judgement, not measured. Low confidence.No evidence listed.implied by the design and the tests the product needs
    Operators
    1
    InferredEngineering judgement, not measured. Medium confidence.No evidence listed.
    Data interface
    none
    Layout
    /Line/OQC1 · ISA-95 EC1-Cell/OQC1