benikigai/ec-1Public
EC-1 Wireless Controller
Synthetic example. Every value is made up to show the format.
Factory · Assembly
Assembly
How does it go together, and in what order?
- 16
- operations
- 4
- sub-assemblies
- 204 s
- total work content computed
All 16 operations, with method, fixture and cycle time
| Operation | Station | Inputs → output | Cycle time | Method | Fixture |
|---|---|---|---|---|---|
Seat light pipe, face buttons and shoulder buttons in top shellop:buttons-in place | Top-shell sub-assembly | part:top-shell, part:light-pipe, part:button-cap, part:shoulder-button → asm:top-sub | 14 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | by hand, shell face-down in nestObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence:src:teardown-log | top-shell nestInferredEngineering judgement, not measured. Medium confidence.No evidence listed. |
Place dome sheet over the buttonsop:dome-place place | Top-shell sub-assembly | asm:top-sub, part:dome-sheet → asm:top-sub | 6 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | by hand onto two locating pinsObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence:src:teardown-log | dome locator pinsInferredEngineering judgement, not measured. Medium confidence.No evidence listed. |
Hand-solder stick module to the PCBA (6 pins)op:stick-solder solder | Stick and PCBA to bottom shell | part:main-pcba, part:stick-module → asm:core | 22 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | hand solder, no-clean flux core wireObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence:src:teardown-log | PCBA nest with stick squareInferredEngineering judgement, not measured. Medium confidence.No evidence listed. |
Snap PCBA into bottom shellop:pcba-place snap-fit | Stick and PCBA to bottom shell | part:bottom-shell, asm:core → asm:core | 6 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | two snaps, then press at four bossesObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence:src:teardown-log | — |
Stick battery into pocket with PSAop:battery-adhere adhesive | Battery and haptic | asm:core, part:battery → asm:core | 10 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | peel liner, place, press 20 N for 3 sObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence:src:teardown-log | battery pressInferredEngineering judgement, not measured. Medium confidence.No evidence listed. |
Place LRA and mate its connectorop:haptic-place connector-mate | Battery and haptic | asm:core, part:haptic-lra → asm:core | 8 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | by hand into rib pocketObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence:src:teardown-log | — |
Mate battery connectorop:battery-mate connector-mate | Battery and haptic | asm:core → asm:core | 5 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | by hand, listen for clickObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence:src:teardown-log | — |
Close top sub-assembly onto the coreop:close snap-fit | Close and screw | asm:core, asm:top-sub → asm:ec-1 | 8 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | align at USB-C end, rotate closedObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence:src:teardown-log | closing fixtureInferredEngineering judgement, not measured. Medium confidence.No evidence listed. |
Drive four M2 screws to 0.18 N·mop:screw screw | Close and screw | asm:ec-1, part:screw-m2x6 → asm:ec-1 | 16 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | torque driver, cross patternObservedSeen directly: teardown, markings, photos. Medium confidence.Evidence:src:teardown-log | closing fixtureInferredEngineering judgement, not measured. Medium confidence.No evidence listed. |
Flash the test image, then RF testop:flash flash | Flash test image and RF test | asm:ec-1 → asm:ec-1 | 30 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | USB-C pogo, then radiated test in shield boxInferredEngineering judgement, not measured. Medium confidence.No evidence listed. | USB-C pogo fixtureInferredEngineering judgement, not measured. Medium confidence.No evidence listed. |
Stick centre and range calibrationop:stick-cal ext:controller:stick-calibrate | Functional test and stick calibration | asm:ec-1 → asm:ec-1 | 15 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | robot sweeps the stick to 8 points and centreInferredEngineering judgement, not measured. Medium confidence.No evidence listed. | stick robot nestInferredEngineering judgement, not measured. Medium confidence.No evidence listed. |
Buttons, IMU, haptics and LEDop:functional test | Functional test and stick calibration | asm:ec-1 → asm:ec-1 | 12 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | press head, 90 degree turntable step, LRA currentInferredEngineering judgement, not measured. Medium confidence.No evidence listed. | — |
Cosmetic and gap checkop:cosmetic inspect | Cosmetic and gap check | asm:ec-1 → asm:ec-1 | 12 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | camera arch plus feeler gauge at shoulder buttonsInferredEngineering judgement, not measured. Medium confidence.No evidence listed. | — |
Charge current and battery checkop:charge test | Charge and battery test | asm:ec-1 → asm:ec-1 | 20 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | 5 V in, measure charge current and cell voltageInferredEngineering judgement, not measured. Medium confidence.No evidence listed. | 8-up rackInferredEngineering judgement, not measured. Medium confidence.No evidence listed. |
Apply rating labelop:label label | Label and pack | asm:ec-1, part:rating-label → asm:ec-1 | 6 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | print and apply, scan serialObservedSeen directly: teardown, markings, photos. Medium confidence.No evidence listed. | — |
Pack with tray and cableop:pack pack | Label and pack | asm:ec-1, part:retail-box, part:pack-tray, part:usb-cable → asm:packed | 14 sInferredEngineering judgement, not measured. Low confidence.No evidence listed.time-study estimate on the synthetic build | tray, unit, cable, close, weighObservedSeen directly: teardown, markings, photos. Medium confidence.No evidence listed. | — |