| B | Baseline Full scorecard (20)| yield | FPY at sta:a2 | 0.992 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | yield | FPY at sta:a3 | 0.996 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | yield | FPY at sta:a4 | 0.99 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | yield | FPY at sta:t1 | 0.985 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | yield | FPY at sta:t2 | 0.978 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | yield | FPY at sta:t3 | 0.983 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | yield | FPY at sta:t4 | 0.995 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | yield | rty | 0.922 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.905 to 0.935 | | yield | failure mode ext:controller:stick-drift (iss:stick-drift-flux) | 0.24 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | yield | failure mode connector-unseat (iss:battery-unseat) | 0.18 simmujocoSimulated with mujoco, 2,000 runs. Low confidence. | | yield | failure mode gap-flush (iss:shoulder-gap) | 0.16 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | throughput | cycle time | 30 s estanalyticEstimated with analytic. Low confidence.slowest station from time studies; needs the discrete-event simulator | | throughput | takt | 36 s estanalyticEstimated with analytic. High confidence. | | throughput | bottleneck station | sta:t1 | | throughput | headcount | 11 | | cost | cost per good unit | $1.92 estanalyticEstimated with analytic. Low confidence.conversion cost per good unit, including scrap and rework | | experience | weight | 69.4 g measuredMeasured on a line or units. Medium confidence.Evidence: src:caliper-run-1 | | experience | gap flush consistency | 0.0493 mm, 1 sigma measuredMeasured on a line or units. Medium confidence.Evidence: src:caliper-run-1 | | experience | predicted field return rate | 0.031 estEstimated. Low confidence. | | experience | review sentiment | 0.42 -1 to 1 measuredreview-analysisMeasured on a line or units with review-analysis. Low confidence.Evidence: src:reviews |
| 92.2% simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.905 to 0.935 | $1.92 estanalyticEstimated with analytic. Low confidence.conversion cost per good unit, including scrap and rework | 30 s estanalyticEstimated with analytic. Low confidence.slowest station from time studies; needs the discrete-event simulator | 11 | frontier |
| 1 | Second RF shield box at T1
var:split-t1 equipmentTwo shield boxes so flashing and RF test run in parallel - add
sta:t1: Second shield box and BLE tester
Generated by agent · analytic · 2026-10-30 Full scorecard (6)| yield | rty | 0.922 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | throughput | cycle time | 25 s estanalyticEstimated with analytic. Low confidence. | | throughput | bottleneck station | sta:t2 | | throughput | headcount | 11 | | cost | cost per good unit | $1.98 estanalyticEstimated with analytic. Low confidence. | | cost | capex | $9,800.00 estanalyticEstimated with analytic. Medium confidence. |
| 92.2% simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | $1.98 estanalyticEstimated with analytic. Low confidence. | 25 s estanalyticEstimated with analytic. Low confidence. | 11 | frontier |
| 2 | FPC connector for the stick instead of hand soldering
var:stick-connector design-changeStick module ships with a flex tail; a ZIF connector replaces six hand-soldered pins Generated by agent · monte-carlo · 2026-10-30 Full scorecard (5)| yield | rty | 0.936 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.92 to 0.95 | | throughput | cycle time | 28 s estanalyticEstimated with analytic. Low confidence. | | throughput | headcount | 11 | | cost | cost per good unit | $1.95 estanalyticEstimated with analytic. Low confidence. | | experience | predicted field return rate | 0.019 estEstimated. Low confidence. |
| 93.6% simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.92 to 0.95 | $1.95 estanalyticEstimated with analytic. Low confidence. | 28 s estanalyticEstimated with analytic. Low confidence. | 11 | frontier |
| 3 | Preload fixture and tug test for the battery connector
var:preload-close fixture-sequenceClosing fixture holds the connector down; a 2 N tug test after mating Generated by agent · mujoco · 2026-10-30 Full scorecard (4)| yield | rty | 0.932 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.915 to 0.945 | | throughput | cycle time | 31 s estanalyticEstimated with analytic. Low confidence. | | throughput | headcount | 11 | | cost | cost per good unit | $1.96 estanalyticEstimated with analytic. Low confidence. |
| 93.2% simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.915 to 0.945 | $1.96 estanalyticEstimated with analytic. Low confidence. | 31 s estanalyticEstimated with analytic. Low confidence. | 11 | dominated by var:stick-connector |
| 4 | Tighten the shoulder gap to 0.10 mm
var:gap-tight design-changeIndustrial design asks for a tighter, more premium seam - modify
part:top-shell: Tighter tool tolerance and a cooling change on the shoulder wall
Generated by agent · monte-carlo · 2026-10-30 Full scorecard (5)| yield | rty | 0.874 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.85 to 0.895 | | throughput | cycle time | 30 s estanalyticEstimated with analytic. Low confidence. | | cost | cost per good unit | $2.60 estanalyticEstimated with analytic. Low confidence. | | experience | gap flush consistency | 0.03 mm, 1 sigma simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. | | experience | cosmetic defect rate | 0.061 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence. |
| 87.4% simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.85 to 0.895 | $2.60 estanalyticEstimated with analytic. Low confidence. | 30 s estanalyticEstimated with analytic. Low confidence. | — | dominated by baseline, var:split-t1, var:stick-connector |
| 5 | Stick connector plus battery preload Recommended
var:connector-and-preload mixedBoth fixes together Generated by agent · monte-carlo · 2026-10-31 Full scorecard (5)| yield | rty | 0.947 simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.93 to 0.96 | | throughput | cycle time | 31 s estanalyticEstimated with analytic. Low confidence. | | throughput | headcount | 11 | | cost | cost per good unit | $1.99 estanalyticEstimated with analytic. Low confidence. | | ramp | changes needed | 3 estEstimated. Medium confidence. |
| 94.7% simmonte-carloSimulated with monte-carlo, 20,000 runs. Low confidence.Interval 0.93 to 0.96 | $1.99 estanalyticEstimated with analytic. Low confidence. | 31 s estanalyticEstimated with analytic. Low confidence. | 11 | frontier |