S6 Close the base

Proposed work instruction for a line that doesn't exist yet. Times are targets.

Equipment: ring bonding fixture with a polarity gauge; pad press with a height gauge; closing press with force monitoring.

Steps

  1. Bond the magnet ring into the base (op:ring-bond). Method: keyed fixture, polarity checked before the press. Target 8 s.
  2. Place the charging coil and ferrite inside the ring (op:coil-place). Method: keyed to the base, adhesive-backed. Target 6 s.
  3. Press the five pogo pads into the base (op:pad-press). Method: press to a hard stop. Target 6 s.
  4. Close the base onto the core (op:base-close). Method: three snaps, force-monitored press. Target 8 s.
  5. Check ring polarity, pad height and the key (op:polarity-check). Method: polarity gauge and height gauge. Target 4 s.

Watch for

  • Battery lead pinched when the base closes (fm:wire-pinch, RPN 72).
  • Magnet ring bonded flipped, or a segment missing (fm:ring-polarity, RPN 36).
  • Coil off-centre in the ring (fm:coil-offset, RPN 45).
  • Pogo pad recessed (fm:pad-recessed, RPN 30).