Changelog
0.1.0, 2026-11-01
First release of the Plus One OPD. OPD 0.4.0, trust level draft, prototype in design.
- Card, build card and design brief.
- 37 parts with STEP and GLB CAD for every mechanical part, an assembled and an exploded model, and a USD scene.
- BOM without prices, likely suppliers, electronics detail.
- 19 operations on an 8-station line, with SOPs, sampling plans, 14 tests and a control plan.
- 10 PFMEA rows, three of them carried over from the EC-1 lessons.
- A variant study: splitting S8, and Plus One+ and Plus One++ as coming next.
- A draft device model under proposal 0001.